Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Locate Plumbing and Plan the Opening

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

The first critical step is to determine the precise location for your access panel. You want to center it over the plumbing you need to access, such as shut-off valves. Use a stud finder to locate the wall studs on either side of the plumbing. You must install the panel in the empty bay between two studs. Use the stud finder's deep scan and AC detection modes to check for any hidden pipes or electrical wires. Once you've confirmed a safe, clear area, use a tape measure and pencil to mark the approximate center of your desired location. Place the access panel's rear frame or the provided paper template against the wall at your mark. Use a level to ensure the template is perfectly horizontal and vertical, then trace its outline onto the wall with the pencil. This traced line will be your cutting guide.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Locate Plumbing and Plan the Opening

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

The first critical step is to determine the precise location for your access panel. You want to center it over the plumbing you need to access, such as shut-off valves. Use a stud finder to locate the wall studs on either side of the plumbing. You must install the panel in the empty bay between two studs. Use the stud finder's deep scan and AC detection modes to check for any hidden pipes or electrical wires. Once you've confirmed a safe, clear area, use a tape measure and pencil to mark the approximate center of your desired location. Place the access panel's rear frame or the provided paper template against the wall at your mark. Use a level to ensure the template is perfectly horizontal and vertical, then trace its outline onto the wall with the pencil. This traced line will be your cutting guide.

Videos for this step

Cut Drywall for AccessCut Opening for Outlet BoxNotch Studs for a Flush Fit

Tools and Materials

← Project

How to Install a Plumbing Access Panel for Future Repairs

Step 1 of 4·1.3 hr left

1
Locate Plumbing and Plan the Opening
20 mins5 itemsIntermediate
2
Cut the Drywall Opening
30 mins3 itemsAdvanced
3
Apply Adhesive and Install the Panel Frame
15 mins4 itemsIntermediate
4
Final Finishing and Cleanup
15 mins3 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.