Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Prepare Workspace and Remove Old Sink

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Begin by turning off the water supply to the sink using the hot and cold shutoff valves located beneath it. If they are inoperable, you must shut off the main water supply to the house. Place a bucket under the P-trap to catch residual water. Use an adjustable wrench to disconnect the hot and cold water supply lines from the valves. Next, loosen the slip nuts on the P-trap and remove it. If replacing a vanity, use a utility knife to score the caulk seal along the backsplash and sides where it meets the wall. Disconnect any clips holding the old sink to the countertop, then carefully lift the old sink and vanity out of the bathroom. Clean the area thoroughly.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Prepare Workspace and Remove Old Sink

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Begin by turning off the water supply to the sink using the hot and cold shutoff valves located beneath it. If they are inoperable, you must shut off the main water supply to the house. Place a bucket under the P-trap to catch residual water. Use an adjustable wrench to disconnect the hot and cold water supply lines from the valves. Next, loosen the slip nuts on the P-trap and remove it. If replacing a vanity, use a utility knife to score the caulk seal along the backsplash and sides where it meets the wall. Disconnect any clips holding the old sink to the countertop, then carefully lift the old sink and vanity out of the bathroom. Clean the area thoroughly.

Videos for this step

Disconnect and Remove Old FaucetShut Off Water and Remove Old FaucetRemove Old Faucet

Tools and Materials

← Project

How to Install a Pedestal Sink

Step 1 of 7·4 hr left

1
Prepare Workspace and Remove Old Sink
45 mins5 itemsIntermediate
2
Install Wall Blocking for Support
60 mins11 items
3
Install Faucet and Drain Assembly
30 mins5 itemsAdvanced
4
Dry Fit Sink and Mark Mounting Locations
20 mins3 itemsIntermediate
5
Mount the Sink Basin and Secure Pedestal
30 mins5 itemsAdvanced
6
Connect Water Supply and Drain Lines
30 mins4 itemsAdvanced
7
Test for Leaks and Apply Caulk
25 mins4 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.