Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Prepare Work Area and Shut Off Water

Begin by completely clearing the cabinet area under the sink to provide ample room to work. Place a small bucket directly under the water supply connections to catch any residual water. Lay down several old towels or rags around the bucket to absorb any splashes. Locate the two water shutoff valves on the wall or floor under the sink—one for hot water and one for cold. Firmly grasp each handle and turn it clockwise (righty-tighty) until it stops. This will shut off the water supply to the faucet. Next, go to the faucet above the sink and turn the handle to the 'on' position in the middle (warm setting). This will release any trapped water pressure and drain the remaining water from the faucet and supply lines into the sink. Let it run until it's just a drip, then turn the faucet off.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Prepare Work Area and Shut Off Water

Begin by completely clearing the cabinet area under the sink to provide ample room to work. Place a small bucket directly under the water supply connections to catch any residual water. Lay down several old towels or rags around the bucket to absorb any splashes. Locate the two water shutoff valves on the wall or floor under the sink—one for hot water and one for cold. Firmly grasp each handle and turn it clockwise (righty-tighty) until it stops. This will shut off the water supply to the faucet. Next, go to the faucet above the sink and turn the handle to the 'on' position in the middle (warm setting). This will release any trapped water pressure and drain the remaining water from the faucet and supply lines into the sink. Let it run until it's just a drip, then turn the faucet off.

Videos for this step

Shut Off Water and Prepare for RemovalDisconnect Water Supply LineRemove the Old Faucet

Tools and Materials

← Project

How to Fix a Leak at a Faucet Supply Line Connection

Step 1 of 5·35 min left

1
Prepare Work Area and Shut Off Water
5 mins2 itemsBeginner
2
Disconnect the Leaking Supply Line
10 mins3 itemsAdvanced
3
Inspect and Clean Connection Threads
5 mins1 itemsBeginner
4
Install the New Supply Line
10 mins2 itemsIntermediate
5
Restore Water and Test for Leaks
5 mins4 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.