Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings
Project video

Step 3 · Allow to Dry and Apply Second Coat (if needed)

Once the first application of patching material is in place, allow it to dry thoroughly. Drying times vary significantly depending on the product used. For spackling paste and some joint compounds, shrinkage may occur, leaving a slight indentation. If this happens, apply a second, thin coat of patching material, feathering the edges once again. Ensure this second coat is also smoothed flush with the surrounding wall.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Allow to Dry and Apply Second Coat (if needed)

Once the first application of patching material is in place, allow it to dry thoroughly. Drying times vary significantly depending on the product used. For spackling paste and some joint compounds, shrinkage may occur, leaving a slight indentation. If this happens, apply a second, thin coat of patching material, feathering the edges once again. Ensure this second coat is also smoothed flush with the surrounding wall.

← Project

Drywall Patching

Step 3 of 6·3.1 hr left

Assess and Prepare the Damaged Area
10 minutes
Choose and Apply Patching Material
15 minutes
3
Allow to Dry and Apply Second Coat (if needed)
120 minutes
4
Sand the Repaired Area
15 minutes
5
Prime the Repaired Area
20 minutes
6
Paint the Repaired Area
30 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.