Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings
Project video

Step 7 · Test Hinge Operation and Alignment

Gently open and close the cabinet door several times. Check for smooth operation, proper alignment with the cabinet frame, and ensure there are no squeaks or sticking points. Make any necessary minor adjustments to the hinge screws to fine-tune the door's position and movement.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Test Hinge Operation and Alignment

Gently open and close the cabinet door several times. Check for smooth operation, proper alignment with the cabinet frame, and ensure there are no squeaks or sticking points. Make any necessary minor adjustments to the hinge screws to fine-tune the door's position and movement.

← Project

Cabinet Hinge Replacement

Step 7 of 7·5 min left

Inspect and Identify Hinge Type
5 minutes
Remove Cabinet Door
5 minutes
Remove Old Hinge
3 minutes
Prepare Mounting Surface
2 minutes
Install New Hinge
5 minutes
Reattach Cabinet Door
7 minutes
7
Test Hinge Operation and Alignment
5 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.