Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings
Project video

Step 1 · Shut Off Water Supply

Locate the shut-off valve, typically found behind the toilet on the wall or floor. Turn the valve clockwise until it is fully closed. This will stop the water supply to the bidet and toilet.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Shut Off Water Supply

Locate the shut-off valve, typically found behind the toilet on the wall or floor. Turn the valve clockwise until it is fully closed. This will stop the water supply to the bidet and toilet.

← Project

Bidet Removal

Step 1 of 6·45 min left

1
Shut Off Water Supply
5 minutes
2
Disconnect Bidet Supply Line
5 minutes
3
Remove Bidet Seat or Attachment
10 minutes
4
Clean Mounting Area
10 minutes
5
Reinstall Original Toilet Seat (if applicable)
10 minutes
6
Turn Water Supply Back On
5 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.