Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Install Light Bulbs and Test the Fixture

Screw in the recommended type and wattage of light bulbs into the sockets of the new fixture. Return to the electrical panel and switch the circuit breaker back on. Test the light switch to ensure the new fixture illuminates correctly and operates as expected. Check for any flickering or other anomalies.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Install Light Bulbs and Test the Fixture

Screw in the recommended type and wattage of light bulbs into the sockets of the new fixture. Return to the electrical panel and switch the circuit breaker back on. Test the light switch to ensure the new fixture illuminates correctly and operates as expected. Check for any flickering or other anomalies.

Videos for this step

Install Light Bulbs and TestRestore Power and Test the New FixturesInstall New Bulbs and Restore Power

Tools and Materials

← Project

Bathroom Vanity Lighting

Step 7 of 8·30 min left

Determine Lighting Needs and Style
60 minutes2 items
Turn Off Power to the Existing Fixture
15 minutes2 items
Remove the Old Light Fixture
30 minutes3 items
Install the New Mounting Bracket
20 minutes3 items
Wire the New Light Fixture
25 minutes4 items
Mount the New Light Fixture
20 minutes2 items
7
Install Light Bulbs and Test the Fixture
15 minutes2 items
8
Install Decorative Covers and Final Touches
15 minutes3 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.