Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Final Connections, Testing, and Leak Detection

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Connect all water supply and drain lines to the main lines. Carefully turn on the water supply, checking all connections and fixtures for leaks. Thoroughly test each fixture for proper operation. If leaks are found, address them promptly before proceeding.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Final Connections, Testing, and Leak Detection

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Connect all water supply and drain lines to the main lines. Carefully turn on the water supply, checking all connections and fixtures for leaks. Thoroughly test each fixture for proper operation. If leaks are found, address them promptly before proceeding.

Videos for this step

Check for LeaksTest for LeaksTest shower

← Project

Bathroom Plumbing Installation: A Complete DIY Guide

Step 5 of 5·almost done

Planning Your Bathroom Plumbing Layout
2 mins3 itemsAdvanced
Installing the Bathroom's Water Supply Lines
4 mins4 items
Installing Bathroom Drain Lines: Ensuring Proper Slope
4 mins
Installing Bathroom Fixtures: Toilet, Sink, and Shower
4 minsAdvanced
5
Final Connections, Testing, and Leak Detection
2 minsAdvanced
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.