Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 8 · Restore Power and Test the System

Once all maintenance tasks are complete, return to your electrical panel and switch the circuit breakers for the indoor air handler and outdoor condenser unit back to the 'ON' position. Allow the system a few minutes to power up. Go to your thermostat and set it to 'Cool' mode with a temperature setting below the current room temperature. Listen for the outdoor unit to start and feel for cool air being distributed through the vents. Monitor the system for a short period to ensure it is operating normally without any strange noises or issues.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Restore Power and Test the System

Once all maintenance tasks are complete, return to your electrical panel and switch the circuit breakers for the indoor air handler and outdoor condenser unit back to the 'ON' position. Allow the system a few minutes to power up. Go to your thermostat and set it to 'Cool' mode with a temperature setting below the current room temperature. Listen for the outdoor unit to start and feel for cool air being distributed through the vents. Monitor the system for a short period to ensure it is operating normally without any strange noises or issues.

Videos for this step

Restore Power and Set ThermostatTest AC System FunctionalityReassemble and Test the Unit

Tools and Materials

← Project

AC System Maintenance

Step 8 of 8·10 min left

Turn Off Power to the AC Unit
5 minutes1 items
Replace or Clean the Air Filter
10 minutes1 items
Clean the Outdoor Condenser Unit Coils
20 minutes3 items
Inspect Refrigerant Lines
10 minutes1 items
Check and Clean the Evaporator Coil (Indoor Unit)
25 minutes3 items
Ensure Proper Airflow Through Vents
10 minutes1 items
Inspect and Clear Condensate Drain Line
15 minutes1 items
8
Restore Power and Test the System
10 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.