Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Dry and Reassemble Indoor Unit

Allow the evaporator coil to air dry completely. Once dry, replace the access panel and secure it with its screws or latches. Reinsert the air filter if it was removed.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Dry and Reassemble Indoor Unit

Allow the evaporator coil to air dry completely. Once dry, replace the access panel and secure it with its screws or latches. Reinsert the air filter if it was removed.

Videos for this step

Reassemble Evaporator UnitReassemble AC Unit and TestReassemble the Unit

Tools and Materials

← Project

AC Coil Cleaning

Step 4 of 8·1.2 hr left

Turn Off Power to AC Unit
5 minutes2 items
Access Indoor Evaporator Coil
10 minutes2 items
Clean Evaporator Coil
30 minutes4 items
4
Dry and Reassemble Indoor Unit
10 minutes2 items
5
Access Outdoor Condenser Coil
10 minutes2 items
6
Clean Condenser Coil
25 minutes2 items
7
Straighten Coil Fins
15 minutes3 items
8
Reassemble Outdoor Unit and Restore Power
10 minutes3 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.